TITLE
Chalkida Waste Treatment Plant
OWNER
DEYA CHALKIDA
PROJECT
Technical Study, Construction and Extension of Sewage Treatment Plant in Chalkida
LOCATION
Chalkida
CONTRACTOR
Technical Company Christoforos D. Constantinidis Sa
CDC S.A. PARTICIPATION
100%
Description
Technical Study-Construction of the Processing Plant of the Municipality of Chalkida
The project contains:
(a) submarine pipelines
(b) waste water pre-treatment
c) reception and pre-treatment of sewage
(d) the sewage treatment process is the activated sludge method in
aeration tanks with nitrogen and phosphorus removal and sludge
anaerobic digestion.
Operation and maintenance of the facility for 18 months
Technical Data
- Designed for 16,000 m3 per day urban waste water, 1600m3 /
day sewage sludge - Equivalent population 60,000