TITLE

Psytalia Waste Water Treatment Facility (Kleps)

OWNER

EYDAP SA

PROJECT

Operation and Maintenance of the Psyttalia Wastewater Treatment Plant

LOCATION

PSYTALIA ISLAND

CONTRACTOR

Joint Venture: Athena Sa – Themeliodomi Sa – Aktor Sa – Technical Companychristoforos D. Constantinidis Sa – Technerga – E. Tsambras Aete

CDC S.A. PARTICIPATION

15%

Description

Provision of specialized scientific and other staff for the operation and maintenance of Biological Water Purification as well as for operational
interventions.

Technical Data

    • TREATMENT PROVISION: 1.000.000 m3 / day
    • OPERATION 60 months:
      • Provision of specialized scientific and other staff for the
        operation and maintenance of the facility for a period of
        39 months
    • CONSTRUCTION
        • Capacity expansion of a pumping station
        • Shredder upgrade,
        • Dehydrated sludge storage silo,
        • Tank sludge scavenger upgrade,
        • Administration building 1718 m