TITLE: “CLUB MED” TOURISTIC PORT
OWNER: CLUB MEDITERRANEE
PROJECT: Construction of a touristic port for the “Club Med” at Gregolimano, Evia
LOCATION: EVIA ISLAND, GREECE
CONTRACTOR: C. D. Constantinidis S.A.
PARTICIPATION: 100%
CATEGORY: Marine, Construction
Description
DESCRIPTION
Construction of sea front with cast in situ concrete of a total length of 84,50m.
Construction of a steel pier with a total length of 90m. The pier is based on concrete blocks resting on rock fill and is protected with rubber fenders. The pier’s platform is made of precast steel and concrete elements.
Removal of existing pier and construction of new wooden pier based on concrete blocks. Construction of all electromechanical installations on both piers.
TECHNICAL DATA
–