TITLE: WATER TREATMENT PLANT OF THESSALONIKI
OWNER: MINISTRY OF ENVIRONMENT AND WATER
PROJECT: DESIGN, CONSTRUCTION AND OPERATION WASTER WATER TREATMENT SEWERAGE OF MAJOR AREA OF THESSALONIKI, STAGE I
LOCATION: INDUSTRIAL AREA OF THESSALONIKI – SINDOS
CONTRACTOR: JOINT VENTURE: TECHNICAL COMPANY CHRISTOFOROS D. CONSTANTINIDIS SA
CDC S.A. PARTICIPATION: 100%
TYPE OF PROJECT: TECHNICAL STUDY-CONSTRUCTION – OPERATION, MAINTENANCE

Description

PROJECT DESCRIPTION

Technical Study-Construction of the Wastewater Treatment Plant of
Thessaloniki Tourist Areas.
Consists of:
(a) pre-processing projects
(b) wastewater treatment and disinfection line
(c) effluent system installation
(d) sludge treatment (fattening, dehydration, digestion, electricity
production from biogas).
Operation and maintenance for 19 months

TECHNICAL DATA

  • Designed for 26,350 m3 / day
  • Isop. population 86,500