TITLE: LAVRION PORT – PHASE II
OWNER: GREEK MINISTRY OF PUBLIC WORKS
PROJECT: Lavrion Port – Construction of southern quay dredging of port basin and rock armouring works at the existing lee breakwater
LOCATION: LAVRION, ATTICA, GREECE
CONTRACTOR: Joint Venture: C. D. Constantinidis S.A. – Domiki Kritis S.A.
PARTICIPATION: 50%
CATEGORY: Construction
Description
DESCRIPTION
Construction of 750m quaywall at foundation depth of -10,50m, made of hollow and solid concrete blocks weighing up to 100 tons, including the construction of special concrete blocks type “monobar” for the absorption of the waves’ energy.
Installation of bollards, hooks, fenders etc. Port basin dredging 360.000m3 at -9,00 and -9,50m. Construction of rock armouring protection on the existing lee breakwater by means of geotextile, quarry run stones and rocks.
Construction of 43.000m3 Port’s land area, including utilities’ construction and asphalt pavement.
TECHNICAL DATA
–