TITLE: PSYTALIA WASTE WATER TREATMENT FACILITY (KLEPS)
OWNER: EYDAP SA
PROJECT: OPERATION AND MAINTENANCE OF THE PSYTTALIA WASTEWATER TREATMENT PLANT
LOCATION: PSYTALIA ISLAND
CONTRACTOR: JOINT VENTURE: ATHENA SA – THEMELIODOMI SA  – AKTOR SA – TECHNICAL COMPANYCHRISTOFOROS D. CONSTANTINIDIS SA – TECHNERGA  – E. TSAMBRAS AETE
CDC S.A. PARTICIPATION: 15%
TYPE OF PROJECT: CONSTRUCTION, OPERATION & MAINTENANCE

Description

PROJECT DESCRIPTION

Provision of specialized scientific and other staff for the operation and
maintenance of Biological Water Purification as well as for operational
interventions.

TECHNICAL DATA

    • TREATMENT PROVISION: 1.000.000 m3 / day
    • OPERATION 60 months:
      • Provision of specialized scientific and other staff for the
        operation and maintenance of the facility for a period of
        39 months
    • CONSTRUCTION
        • Capacity expansion of a pumping station
        • Shredder upgrade,
        • Dehydrated sludge storage silo,
        • Tank sludge scavenger upgrade,
        • Administration building 1718 m