TITLE: PSYTALIA WASTE WATER TREATMENT FACILITY (KLEPS)
OWNER: EYDAP SA
PROJECT: OPERATION AND MAINTENANCE OF THE PSYTTALIA WASTEWATER TREATMENT PLANT
LOCATION: PSYTALIA ISLAND
CONTRACTOR: JOINT VENTURE: ATHENA SA – THEMELIODOMI SA – AKTOR SA – TECHNICAL COMPANYCHRISTOFOROS D. CONSTANTINIDIS SA – TECHNERGA – E. TSAMBRAS AETE
CDC S.A. PARTICIPATION: 15%
TYPE OF PROJECT: CONSTRUCTION, OPERATION & MAINTENANCE
Description
PROJECT DESCRIPTION
Provision of specialized scientific and other staff for the operation and
maintenance of Biological Water Purification as well as for operational
interventions.
TECHNICAL DATA
-
- TREATMENT PROVISION: 1.000.000 m3 / day
- OPERATION 60 months:
- Provision of specialized scientific and other staff for the
operation and maintenance of the facility for a period of
39 months
- Provision of specialized scientific and other staff for the
- CONSTRUCTION
-
- Capacity expansion of a pumping station
- Shredder upgrade,
- Dehydrated sludge storage silo,
- Tank sludge scavenger upgrade,
- Administration building 1718 m
-