TITLE: WATER TREATMENT PLANT IN THESSALONIKI
OWNER: EYDE THESSALONIKIS / KORIMVOS SA
PROJECT: RESTORATION OF TWO FINAL SEDIMENTATION TANKS CPI41.023 AND DΚ41.024 AT THE THESSALONIKI WASTE WATER TREATMENT PLANT AND INSTALLATION OF MECHANICAL EQUIPMENT
LOCATION: INDUSTRIAL AREA OF THESSALONIKI – SINDOS
CONTRACTOR: TECHNICAL COMPANY CHRISTOFOROS D. KONSTANTI
NIDIS SA AS SUBCONTRACTOR
CDC S.A. PARTICIPATION: 100%
TYPE OF PROJECT: CONSTRUCTION

Description

PROJECT DESCRIPTION

Decrease of the groundwater level in the area of the final sedimentation
tanks 41.023 and 41.024 in HEL
Restoration of the damages of the final sedimentation tanks DTK 41.023
and 41.024 of EELTH due to excess of the operational conditions.
Placement of the conventionally planned complete system of
electromechanical equipment, ie the final settlement bridges of HEL.

TECHNICAL DATA