TITLE: CHALKIDA WASTE TREATMENT PLANT
OWNER: DEYA CHALKIDA
PROJECT: TECHNICAL STUDY, CONSTRUCTION AND EXTENSION OF SEWAGE TREATMENT PLANT IN CHALKIDA
LOCATION: CHALKIDA
CONTRACTOR: TECHNICAL COMPANY CHRISTOFOROS D. CONSTANTINIDIS SA
CDC S.A. PARTICIPATION: 100%
TYPE OF PROJECT: TECHNICAL STUDY-CONSTRUCTION – OPERATION – MAINTENANCE
Description
PROJECT DESCRIPTION
Technical Study-Construction of the Processing Plant of the
Municipality of Chalkida
The project contains:
(a) submarine pipelines
(b) waste water pre-treatment
c) reception and pre-treatment of sewage
(d) the sewage treatment process is the activated sludge method in
aeration tanks with nitrogen and phosphorus removal and sludge
anaerobic digestion.
Operation and maintenance of the facility for 18 months
TECHNICAL DATA
- Designed for 16,000 m3 per day urban waste water, 1600m3 /
day sewage sludge - Equivalent population 60,000