TITLE: WATER TREATMENT INSTALLATION OF THESSALONIKI (EENTH)
OWNER: EYATH. SA
PROJECT: TECHNICAL STUDY CONSTRUCTION AND OPERATION OF THE THESSALONIKI WATER SUPPLY FROM ALIAKMON RIVER (1st PHASE OF THE REFINERY)
LOCATION: IONIA THESSALONIKI (BEHIND SIDENOR)
CONTRACTOR: JOINT VENTURE: EMPEDOS SA – TECHNICAL COMPANY CHRISTOFOROS D. KONSTANTINIDIS SA – SECIT Spa – AUSTRIAN ENERGY & ENVIRONMENT
CDC S.A. PARTICIPATION: 40%
TYPE OF PROJECT: TECHNICAL STUDY, CONSTRUCTION AND OPERATION
Description
PROJECT DESCRIPTION
Technical study, construction and operation of the water treatment
facilities for the water of Aliakmonas River to render it drinkable for
providing water supplies to the city of Thessaloniki.
Cleaning process: Removal of haze, pesticides, asbestos fibers.
Includes:
(a) Pretreatment (Measurement, Flow Control, pre-oxidation, pH
Adjustment, Addition of Aluminum Sulfate)
(b) Processing (Three Flocculation-Sedimentation Tanks, Ten Refining
Beds, Ozone Plant, Eight Beds of Activated Carbon)
(c) Water consumption preparation: (pH adjustment, chlorination)
(d) Sludge treatment plants: (Pumping stations, thickening, dehydration)
(e) Cabron Regeneration Plant, Ozone Production, Chemical Additive
Storage and Dilution, Administration Building, Chemical Laboratories,
Repair Workshop, Substation
(g) 11-month pilot operation
(h) Efficient operation 18 months
TECHNICAL DATA
- Unit Capacity Up to 150,000m3 / Day
- In – line water quality control parameters
- Backup Power Generator
- Lightning protection system
- Medium Voltage Substation
- Central Control Unit – SCADA
- Quality Drinking Water Quality Lab
- Installed power 1.810 kW