TITLE
Water Treatment Plant in Thessaloniki
OWNER
EYDE THESSALONIKI
PROJECT
Technical Study – Construction of the Thermal Drying Unit of Dehydrated Sludge of Eelth.
LOCATION
Industrial Area of Thessaloniki – Sindos
CONTRACTOR
Technical Company Christoforos D. Konstanti Nidis Sa
TYPE OF PROJECT
100%
Description
Technical Study – Construction, assurance of efficient operation and maintenance for a period of 15 months of the Sludge Thermal Drying Unit of Thessaloniki Wastewater Treatment Plant and related facilities.
Technical Data
The Thermal Drying Unit consists of two parallel drying rotors with rotating drums with a nominal exhaust capacity per line of 4,000 kg H 2 O per hour in continuous operation and maximum exhaust capacity per line of 4,600 kg H 2 O per hour for 7 days continuous operation.
Treatment of dehydrated sludge from EELTH. Total quantity of solid material 58.000kgr DS / nm and dehydrated sludge concentration from 18% to 28%.